
- Supplement Analysis of the 2005 Final Site-wide Environmental Impact Statement for Decontamination and Decommissioning (D&D) Projects Dec. 2019, 25 pages (2 MB pdf document)
- U.S. Department of Energy Finding of No Significant Impact for the Proposed Action to Construct and Operate a Water Disinfection Facility at Lawrence Livermore National Laboratory May 2018, 2 pages (.5 MB pdf document)
- FINAL Environmental Assessment for the Proposed Construction and Operation of a Water Disinfection Facility at Lawrence Livermore National Laboratory April 2018, 40 pages (9 MB pdf document)
- Supplement Analysis of the Lawrence Livermore National Laboratory Final Site-wide Environmental Impact Statement for the Exascale Computing Facility Modernization (ECFM) Project 2017 29 pages (14 MB pdf document)
- Final Environmental Assessment for the Proposed Increase in the Weight of Explosives Detonated at Lawrence Livermore National Laboratory Experimental Test Site, Site 300 2018 139 pages (5 MB pdf document)
- U.S. Department of Energy Finding of No Significant Impact for the Proposed Action to increase the weight of explosives used at Lawrence Livermore National Laboratory, Site 300 2018 2 pages (pdf document)
- List of Modeling Files 2018 1 pages (56 MB zip document)
Some of the files included in the package require Hotspots Analysis and Reporting Program (HARP), AERmod, or Combined Obscuration Model for Battlefield Induced Contaminants (COMBIC) software to open.
To further transparency and openness in its implementation of the National Environmental Policy Act (NEPA), the NNSA will document and post online all categorical exclusion (CX) determinations involving classes of actions listed in Appendix B to Subpart D of the DOE's NEPA regulations, 10 CFR Part 1021.
- Building 611 Underground Storage Tank Replacement FY24
- Site 300 Well 21 October 2022
- Corral Hollow Road Widening Project May 2021
- LLNL Offsite Training Activities May 2021
- Livermore Valley Open Campus (LVOC), Advanced Biotechnology Research and Response Laboratory September 2020
- Diffraction experiments using insensitive high explosives (IHE) at the National Ignition Facility (NIF) May 2020
- Security Kiosk Canopy Installation 2018
- Security Surveillance Project June 2017
- Applied Materials and Engineering (AME) Capabilities Consolidation April 2017
- Electric Vehicle Charging Station Installation and Operation April 2017
- Roof Replacements at LLNL March 2017
- Greenhouse Installation and Operation March 2017
- Cellular phone service at Site 300 June 2016.
- Construction and Operations of Building 276, Security Fitness and Training Center Replacement Facility Feb. 2016.
- Livermore Site HVAC Modernization Feb. 2016.
- LLNL unmanned aircraft systems (UAS) testing and operations Nov. 2015.
- Amsinckia Grandiflora Recovery Efforts June 2015.
- Lease for Monopole Communication Cell tower Installation and Operation April 2015.
- Ground-Based Laser Field Experiments April 2015.
- East Gate and Vasco Gate Kiosk Modifications March 18, 2015.
- High-Pressure Cryogenic Pump and Hydrogen Filling Station May 14, 2012.
- Vessel Burst Test, Site 300 Feb. 9, 2015.
- Experimental Detector Construction and Operation. April 11, 2013.
- M2 Pool Habitat Enhancement Project, Site 300. June 19, 2013.
- M1a and b Habitat Enhancement Project, Site 300. June 19, 2013.
- Livermore Site Solar Photovoltaic (PV) Farm. March 19, 2014.
- Expanding Operations of the Mobile Analytical Laboratory. Feb. 24, 2013.
- Relocation of Central GSA Misting Towers. Feb. 24, 2013.
- B321C Radiography of Explosive Samples. Aug. 13, 2012.
- LLNL Mobile Hydrogen-Fueling Station and Use of Hydrogen Buses at LLNL. Aug. 11, 2010.
- Bldg. 850 Mitigation Pond (Pool BC), Site 300, LLNL. June 7, 2011.
- High-Pressure Cryogenic Pump and Hydrogen Filling Station at LLNL. May 14, 2012.
2005 SWEIS
- SWEIS Record of Decision signed 2005
- Volume I, Chapters 1 through 12 - 815 pages (137.5MB pdf document)
- Volume II, Appendix A through D - 614 pages (37.1MB pdf document)
- Volume III, Appendix E through P - 597 pages (115.4MB pdf document)
- Volume IV, Comment Response Document - 756 pages (195.8MB pdf document)
- Summary - 58 pages (3.8MB pdf document)
2011 SWEIS Supplement Analysis
- Supplement Analysis of the 2005 Final Site-Wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory -- Determination - 2005 (100 K pdf document)
- 2011
- Supplement Analysis of the 2005 Final Site-wide Environmental Impact Statement For Continued Operation of Lawrence Livermore National Laboratory --Volume I: Main Report - 2011 (2 MG pdf document)
- Supplement Analysis of the 2005 Final Site-wide Environmental Impact Statement For Continued Operation of Lawrence Livermore National Laboratory -- Volume II: Comment Response Document - 2011 (7 MG pdf document)